Jul. 25th, 2018

ilanarama: a mountain (mountain)
A lot has happened since I posted about our house construction back in May!

The in-floor heating pipes have been laid (and are now covered up with the concrete subfloor):

IMG_20180628_200536 IMG_20180624_125742

Lights, internet, and other electronics have been wired:

IMG_20180624_130419 IMG_20180609_180816

We are going with as much home automation as we can, with lights, fans, window shades, sound system etc all controlled by our smartphones.

Most excitingly, we've got most of the windows now, and the exterior wood and stone has begun to be set in place! It's beginning to look like a real house instead of a skeleton house:

IMG_20180706_134426 IMG_20180721_121448

IMG_20180711_130325 IMG_20180714_121009

IMG_20180628_115928 IMG_20180628_193839

More house photos at Flickr

Profile

ilanarama: me, The Other Half, Moab UT 2009 (Default)
Ilana

June 2025

S M T W T F S
1234567
891011121314
15 161718192021
22232425262728
2930     

My running PRs:

5K: 21:03 (downhill) 21:43 (loop)
10K: 43:06 (downhill)
10M: 1:12:59
13.1M: 1:35:55
26.2M: 3:23:31

You can reach me by email at heyheyilana @ gmail.com

Tags

Page Summary

Expand Cut Tags

No cut tags