Mar. 2nd, 2019

ilanarama: my footies in my finnies (snorkeling)
Nearly two months after discovering problems with the wood flooring, we...still don't have a new floor. The old floor has been ripped up, though, finally, and the new flooring that we chose is in boxes waiting to be installed. The delay is because manufacturer wanted a second inspector to come look at it, and he couldn't get here until about a week into February, and then we had to wait for the approval, and then the guy who was going to rip out the flooring couldn't get here because we got a lot of snow. The cement underneath needs patching before the new new floor gets laid, and the trim will need to be redone. For a manufacturing error that we are not having to pay for, we are still having to pay for an awful lot of labor...

(Btw, if you want to see the sort of problems we had with the original flooring, here are two photos showing the cracking along the planks.)

A few things have been finished, though. The hardware in the master bath sink area is looking pretty good:

vanity cabinet and sinks and mirrors

The picture was taken before the bedroom floor was taken out, so you can still see it in the background. Also, our custom range hood has been installed, along with the redone backsplash. The black under the cabinets is the same metal as the hood; the inset granite panel is the same "volcano" pattern that is on the kitchen island (hidden under the blue protective foam). The rest of the countertop is a black granite with a very subtle pattern.

broad kitchen view closer view of range area

Britt and the contractor have also been discussing putting rails on the roof to keep the snowslides under control. Right now our unfinished back patio is rather covered, as seen by the view from the patio looking along the wall where my office and bedroom are, and by the view out my office window:

pile of snow next to house pile of snow through window

Seven weeks to closing on our current house. I suspect we'll need every bit of it...

Profile

ilanarama: me, The Other Half, Moab UT 2009 (Default)
Ilana

July 2024

S M T W T F S
 123456
78910111213
1415161718 1920
21222324252627
28293031   

My running PRs:

5K: 21:03 (downhill) 21:43 (loop)
10K: 43:06 (downhill)
10M: 1:12:59
13.1M: 1:35:55
26.2M: 3:23:31

You can reach me by email at heyheyilana @ gmail.com

Tags

Expand Cut Tags

No cut tags