The in-floor heating pipes have been covered with the sub-floor.
The wall framing has been covered with drywall (and the first coat of paint).
The rafters and insulation have been covered with a roof.
What a difference!

IMG_20180628_200536 IMG_20180814_145406

IMG_20180401_143856< IMG_20180817_141242

Okay, there have been many intermediate changes between these sets of pictures - the older interior one's from June and the exterior, from April - but still. It's turning into a house!